Business Analysis and Systems Design – Flashcards & Quiz Questions

How business problems are analysed and turned into information system requirements and designs, using development life cycles, process and data models, UML and agile methods.

320 flashcards · 159 quiz questions · 8 topics

Get all 320 cards with Lifetime

1. Business Analysis and the Role of the Analyst

Foundations of Business Analysis · Role and Skills of the Analyst · Identifying and Classifying Stakeholders · The BABOK Guide and IIBA · Information Systems as Analysis Context

What is business analysis as a professional practice?
Business analysis is the practice of enabling change in an organisation by defining needs and recommending solutions that deliver value to stakeholders.
Why is business analysis described as enabling change rather than simply reacting to problems?
Because it is a deliberate, structured effort: it defines what needs to change and recommends a solution, so the change is planned rather than accidental.
Why must needs be defined before solutions are recommended?
Needs describe the problems or opportunities stakeholders actually face. Without a clear definition of the need, a proposed solution may not address the real issue.

Which statement correctly defines business analysis?

  1. A. Designing the hardware and software components that make up an organisation's information system.
  2. B. Coordinating the technical team that builds software so it is delivered on schedule and within budget.
  3. C. Recording stakeholder requests as requirements without deciding which needs should be met.
  4. D. Enabling organisational change by defining needs and recommending solutions that deliver value to stakeholders.

Business analysis is the practice of enabling organisational change by defining needs and recommending solutions that deliver value to stakeholders. This makes both the change purpose and stakeholder value central, unlike coordinating a technical team, merely recording requests, or designing system components.

A retail bank wants to reduce long customer wait times. A junior analyst immediately proposes new queue software. Which action reflects the foundations of business analysis?

  1. A. Define the underlying need behind the long waits, then recommend a solution expected to deliver value to customers.
  2. B. Ask the technical team to decide which stakeholders should benefit from the change.
  3. C. Record customer complaints as requirements and hand them to the developers unchanged.
  4. D. Select the queue software first, then write requirements that justify the choice.

Business analysis begins by defining the underlying need and only then recommends a solution expected to deliver value. Choosing the software first or passing complaints straight through skips that analysis.

40 flashcards and 19 quiz questions in this topic.

2. Systems Development Life Cycles and Methodologies

SDLC Phases and Overview · The Waterfall Model · Prototyping and Iterative Development · Agile Manifesto and Core Values · Scrum Framework and Product Backlog

What is the systems development life cycle (SDLC), and what five phases does it include?
The SDLC is a structured framework for building and managing an information system. It includes planning, analysis, design, implementation, and maintenance or support.
What is the main purpose of the planning phase of the SDLC?
Planning defines the problem, the project scope and its objectives, and checks whether the project is feasible in terms of cost, time, technology and operations. It decides whether the project is worth pursuing.
What is the main output of the planning phase?
The main output is a feasibility report together with a project plan that sets the scope, schedule, resources and deliverables. It gives management a basis for approving or rejecting the project.

Which phase of the SDLC produces a technical blueprint that describes the system's architecture, data structures and interfaces?

  1. A. The analysis phase
  2. B. The design phase
  3. C. The maintenance phase
  4. D. The planning phase

The design phase turns agreed requirements into a technical blueprint covering architecture, data structures and interfaces. Planning establishes feasibility and scope, analysis records what users need, and maintenance deals with changes after the system is live.

A team has finished gathering user needs and has an approved requirements specification. Programmers now write the code, run unit and integration tests, convert existing data and install the system for users. Which SDLC phase are they carrying out?

  1. A. The analysis phase
  2. B. The design phase
  3. C. The planning phase
  4. D. The implementation phase

Implementation is the phase in which the design becomes working software through coding, testing, data conversion and installation. Planning, analysis and design all take place before this build-and-install work.

40 flashcards and 20 quiz questions in this topic.

3. Project Initiation and Feasibility

System Request and Business Case · Feasibility Study Purpose and Process · Technical and Operational Feasibility · Economic Feasibility and Cost-Benefit Analysis · Schedule and Legal Feasibility

What is a system request, also called a business case, in systems development?
A system request is a brief document that explains the business need, the expected benefits and the estimated costs of a proposed system. It is used to propose the project and seek approval to begin it.
Why is the system request described as the first project deliverable?
It is the first formal document produced in a project, written before any feasibility study or design work. It records the idea in a form that management can evaluate.
What does the business need in a system request address?
It describes the problem or opportunity the organisation wants to address, such as slow processing, high costs or a new business requirement. It explains why the system is worth considering.

Which statement describes the role of a system request in a systems development project?

  1. A. It lists the test cases and user acceptance criteria for each module of the system.
  2. B. It explains the business need, expected benefits and costs so management can decide whether to start.
  3. C. It records the detailed program design and database structure prepared before coding begins.
  4. D. It compares the finished system's performance with the original goals after implementation.

A system request is the short proposal that sets out why the system is needed, what benefits are expected and what it will cost. Detailed design, post-implementation review and test plans all come later.

In the early life of a systems project, which activity happens first?

  1. A. Analysts complete a detailed economic feasibility study using net present value.
  2. B. The team produces a full requirements specification for the proposed new system.
  3. C. The organisation implements the system and trains the people who will use it.
  4. D. A sponsoring manager writes and submits a system request describing the business need.

Project initiation starts with the system request from a sponsoring manager. Feasibility analysis, requirements work and implementation only follow if that proposal is approved.

40 flashcards and 20 quiz questions in this topic.

4. Requirements Elicitation and Management

Requirements Elicitation Techniques · Functional and Non-Functional Requirements · Prioritising Requirements with MoSCoW · Requirements Traceability in Practice · Scope Creep and Change Control

What is requirements elicitation and why is it done at the start of a systems project?
It is the fact-finding process of discovering what stakeholders need from a proposed system. The analyst gathers this through conversations, observation and existing records so the design is based on real needs rather than assumptions.
What are the main strengths and weaknesses of interviews as a requirements elicitation technique?
Interviews let the analyst ask follow-up questions, explore complex needs and build trust with a stakeholder. They are slow to arrange, depend on the availability and honesty of the interviewee, and may reflect one person's view rather than the whole group.
In what situation would a questionnaire be more suitable than interviews, and what is its main drawback?
A questionnaire suits a large, scattered audience that must answer the same short questions, because it is cheap and gives consistent answers that are easy to count. Its drawback is that the analyst cannot probe an interesting answer or clarify confusion, and response rates can be low.

A development team wants users, managers and analysts to agree on requirements together in one facilitated session. Which elicitation technique is being described?

  1. A. Questionnaire distributed to all branch staff
  2. B. Document analysis of procedure manuals
  3. C. Observation of staff during normal work
  4. D. Joint application development (JAD) workshop

A JAD workshop is a facilitated group session where stakeholders and analysts jointly define requirements and settle differences. Questionnaires, document reviews and observation collect information separately rather than producing group agreement in one meeting.

A loan department processes applications faster than its written procedure says. The analyst needs to discover the informal shortcuts staff actually use, including steps they do not mention in meetings. Which single technique is most likely to reveal these steps?

  1. A. Observation of staff performing their normal work
  2. B. Questionnaire sent to the loan officers
  3. C. Document analysis of the procedure manual
  4. D. Joint application development workshop

Observation shows the real work as it happens, so informal shortcuts and unwritten habits become visible. Self-reported answers, written procedures and group discussion reflect what people say should happen, not necessarily what they do.

40 flashcards and 20 quiz questions in this topic.

5. Process Modelling

Process Modelling Fundamentals and DFD Symbols · Drawing Context Diagrams · Leveled DFDs and Balancing · BPMN Business Process Diagrams · Business Process Reengineering

Why do systems analysts build process models when analysing a business system?
A process model gives analysts, users and developers a shared picture of how work is done. It documents the current system and serves as a blueprint for designing the proposed system.
What is a data flow diagram (DFD), and what are its four symbols?
A DFD shows how data moves through a system. Its four symbols are external entities, processes, data stores and data flows.
How does a data-flow view differ from a control-flow view of a business process?
A data-flow view asks what data is produced, where it goes and where it is kept, as in a DFD. A control-flow view asks what happens in what order, using activities, gateways, events and sequence flows, as in BPMN.

Which statement describes a purpose of process modelling in systems analysis?

  1. A. To assign programming tasks to developers and set the project schedule
  2. B. To calculate the expected profit and payback period of the proposed system
  3. C. To write the validation rules that will be stored inside the database
  4. D. To produce a shared picture of how work is done that can document the current system and guide the design of a new one

Process models give analysts and users one common description of work, so the same picture can document the current system and act as a blueprint for the proposed system. Scheduling, budgeting and database rules are separate activities.

Which statement correctly contrasts a data-flow view with a control-flow view?

  1. A. A data-flow view and a control-flow view both show sequence flows, but only control flow uses arrows
  2. B. A data-flow view traces what data is sent, received and stored, while a control-flow view traces the order of activities, decisions and events
  3. C. A data-flow view shows only external entities, while a control-flow view shows only data stores
  4. D. A data-flow view traces the order of activities and decisions, while a control-flow view traces where data is stored

A data-flow diagram shows where data moves and is kept without implying when steps happen, while a control-flow notation such as BPMN shows order with sequence flows and decisions with gateways.

40 flashcards and 20 quiz questions in this topic.

6. Object-Oriented Analysis and UML

Foundations of Object-Oriented Analysis and UML · Use Case Diagrams and Actor Goals · Class Diagrams and Structural Relationships · Sequence Diagrams and Object Interactions · Activity Diagrams and Process Flows

In object-oriented analysis, what is an object?
An object is a concrete instance of a class that holds its own data (attributes) and can perform behaviour (operations). It stands for a real or conceptual thing in the problem being modelled.
What is a class in object-oriented analysis?
A class is a blueprint that defines the attributes and operations shared by a set of objects. Objects are created from the class, so the class describes structure while each object holds specific values.
How are a class and an object related?
A class is an abstract definition; an object is one concrete instance of it with its own attribute values. Many objects can be created from the same class.

Which organisation maintains the Unified Modeling Language?

  1. A. Object Management Group
  2. B. International Telecommunication Union
  3. C. Institute of Electrical and Electronics Engineers
  4. D. World Wide Web Consortium

The Object Management Group (OMG) is the organisation that maintains UML as a standard visual language for specifying, visualising and documenting software systems.

What does encapsulation mean in object-oriented analysis?

  1. A. Keeping an object's internal data private and exposing behaviour through methods
  2. B. Organising classes into a hierarchy where subclasses inherit features
  3. C. Drawing the order of messages exchanged by objects in a scenario
  4. D. Showing the goals that actors achieve when using a system

Encapsulation bundles an object's data with the methods that operate on it and hides the internal representation, so other objects interact only through the defined interface.

40 flashcards and 20 quiz questions in this topic.

7. Systems Design

System Acquisition and Design Strategies · Architecture Design and Processing Distribution · User Interface Design Principles · Input Design and Data Validation · Data Storage, Program and Security Design

What does systems design specify, and which areas must it address?
Systems design specifies how the proposed system will meet the stated requirements. It addresses architecture, the user interface, data storage, program design and security design.
What are the three main design strategies for acquiring a system?
The three strategies are custom development, buying packaged software, and outsourcing. They differ in who builds the system and how closely it is tailored to the organisation.
What is custom development in system acquisition?
Custom development means the organisation builds a system from scratch to satisfy its own specific requirements. It is the alternative to purchasing a ready-made product.

Which statement describes a recognised advantage of buying packaged software over building a system in-house?

  1. A. It removes the need for user training, data conversion or any internal project management.
  2. B. It guarantees an exact match with every distinctive internal workflow the organisation uses.
  3. C. It transfers responsibility for all future system decisions to an external supplier.
  4. D. It is generally cheaper and quicker to obtain, and the vendor provides updates and ongoing support.

Packaged software is pre-built for many buyers, so it is faster and cheaper to acquire than a system written from scratch, and vendors normally provide updates and support. Exact workflow fit and the removal of training needs are not features of an off-the-shelf product.

A college needs a standard payroll system nearly identical to products several vendors sell, and it has no in-house developers. Which acquisition strategy does this situation point to?

  1. A. Commissioning a custom-built system from an external software house.
  2. B. Requiring each department to create and run its own separate system.
  3. C. Building a bespoke payroll system from scratch with newly recruited internal staff.
  4. D. Buying packaged software and configuring it to suit the college.

When requirements match an existing product and no development team exists, a ready-made system is the practical option. Commissioning bespoke development would add cost and time without solving a genuine fit problem.

40 flashcards and 20 quiz questions in this topic.

8. Implementation, Testing and Changeover

Implementation Planning and System Installation · Testing Levels from Unit to Acceptance · Changeover and Conversion Strategies · User Training, Documentation and Change Management · System Maintenance and Support

What is an implementation plan in systems implementation?
It is a document that sets out the tasks, resources, responsibilities and timing needed to install and activate the new system. It turns the design into an ordered schedule of work.
Why must an implementation plan show dependencies between tasks?
Some activities can only begin after others finish, such as installing software once the hardware is in place. Showing these links avoids wasted effort and rework.
What does site preparation involve before a new system is installed?
It means getting the physical and technical environment ready: adequate space, power, cooling, cabling and network connections, plus a secure location for equipment.

Which document sets out the tasks, resources, responsibilities and timing for installing and activating a new system?

  1. A. A feasibility report
  2. B. An implementation plan
  3. C. A user manual
  4. D. A maintenance log

An implementation plan schedules the installation tasks, resources and responsibilities, whereas a user manual guides users, a maintenance log records faults and a feasibility report supports the earlier approval decision.

A company is preparing to install a new system, but the server room has no spare power outlets and the network cabling has not been run. Which implementation activity should be completed first?

  1. A. Providing power, cooling and network cabling at the site
  2. B. Recording completed steps on the installation checklist
  3. C. Installing the application software on the server
  4. D. Creating user access rights in the database

Preparing power, cooling and network cabling gives the hardware a working environment; software, access rights and checklist records come after the equipment can be connected.

40 flashcards and 20 quiz questions in this topic.

Study every card

Every card and question in this course comes with the Lifetime package. Add it to GoodScores and practise with flashcards, quizzes and spaced review.

Get all 320 cards with Lifetime