GoodScores

Business Modelling for Decision Making – Flashcards & Quiz Questions

How quantitative and spreadsheet models such as linear programming, decision analysis, simulation, forecasting, queuing and investment appraisal support business decisions.

320 flashcards · 159 quiz questions · 8 topics

Get all 320 cards with Lifetime

1. Modelling and the Decision-Making Process

The Nature and Purpose of Models · Core Components of a Decision Model · Deterministic versus Probabilistic Models · Stages of the Modelling Process · Spreadsheet Model Design and Checking

What is a model in the context of decision making?
A model is a simplified representation of a real situation. It is built to help a decision maker understand that situation and compare alternatives.
Why is a model simplified instead of reproducing every detail of the real situation?
Real situations contain more detail than a decision maker can use, so a model keeps the features that matter to the decision and leaves the rest out. If it leaves out something that matters, it can mislead.
How does a model help a decision maker understand a situation?
By representing the situation in a simpler form, a model makes the main features and their relationships easier to see. This gives the decision maker a clearer picture before deciding.

Which statement describes a model in decision making?

  1. A. An exact copy of past decisions that is used only to justify a choice after the event.
  2. B. An unsupported guess about future events that has no connection to how the real situation works.
  3. C. A simplified representation of a real situation that helps a decision maker understand it and compare alternatives.
  4. D. A complete reproduction of a real situation that records every detail before any choice is made.

A model keeps only the features that matter for the decision, making the situation understandable and alternatives comparable without every real-world detail. Reproducing all detail, merely recording past choices, or guessing without a link to reality does not serve that purpose.

What benefit does a decision maker gain by using a model to compare alternatives?

  1. A. The chosen option is guaranteed to succeed because the model removes all uncertainty.
  2. B. The decision maker no longer needs to understand the situation being modelled.
  3. C. The model records the final choice so that it can be defended to other people.
  4. D. Options can be tried against the same simplified situation without changing the real system.

Because the model stands in for the real situation, options can be tested within it and their effects compared before any real commitment is made. It does not guarantee success, replace understanding, or simply document a decision.

40 flashcards and 20 quiz questions in this topic.

2. Linear Programming Formulation and Graphical Solution

Formulating the Linear Programming Model · Plotting Constraints and the Feasible Region · Corner Points and the Optimal Solution · Binding Constraints, Slack and Surplus · Special Cases in Graphical Solutions

What is a decision variable in a linear programming model, and what does it represent?
A decision variable is an unknown quantity the decision maker can control, such as the number of units of a product to make. The model solves for the values of these variables that give the best outcome.
What is the objective function in a linear programming model?
It is the linear expression, such as 5X + 4Y, that is maximised or minimised. Its coefficients show the contribution of each decision variable to the goal, such as profit per unit.
How does a resource constraint differ from a requirement constraint in a linear programming model?
A resource constraint limits the use of something scarce and is written with '<=' , for example X + Y <= 10. A requirement constraint sets a minimum that must be met and is written with '>=' .

In a linear programming model, what is expressed by the condition X, Y >= 0?

  1. A. The objective function must be maximised instead of minimised
  2. B. The model may contain no more than two constraints
  3. C. All constraints must be equalities at the optimal solution
  4. D. Every decision variable must be zero or a positive number

Non-negativity conditions prohibit negative values because quantities such as units produced cannot fall below zero. They do not decide whether the objective is maximised, how many constraints exist, or whether constraints bind.

A firm produces two products, X and Y. Each unit of X adds RM5.00 to profit and each unit of Y adds RM4.00. What is the objective function for maximising total profit?

  1. A. Maximise 9(X + Y)
  2. B. Maximise 5X - 4Y
  3. C. Maximise 20XY
  4. D. Maximise 5X + 4Y

Each unit of X contributes RM5.00, so X units contribute 5.00X; each unit of Y contributes RM4.00, so Y units contribute 4.00Y. Adding the separate contributions gives total profit of 5.00X + 4.00Y, written as 5X + 4Y.

40 flashcards and 20 quiz questions in this topic.

3. Sensitivity Analysis and Solver

Foundations of Sensitivity Analysis · Reduced Cost and Objective Coefficient Ranges · Shadow Prices and Right-Hand Side Ranges · Reading the Sensitivity Report · Setting Up Excel Solver

What is the main purpose of post-optimality (sensitivity) analysis in linear programming?
It examines how the optimal solution and the optimal objective value respond when model inputs change after a solution has been found. It shows how robust the recommendation is and which inputs matter most.
In a linear programming model, what exactly is the 'optimal solution'?
It is the set of values of the decision variables at optimality, such as how many units of each product to make. It answers what should be done, not how much value is gained.
What is the 'optimal objective value'?
It is the value of the objective function, such as total profit or total cost, evaluated at the optimal solution. It answers how much is gained or spent rather than which quantities to choose.

A company solves a linear programming model and then examines what happens if the profit per unit changes. Which statement describes what post-optimality analysis does?

  1. A. It converts an integer model into a linear one for faster solving.
  2. B. It studies how the optimal solution and objective value respond to changes in model inputs.
  3. C. It only checks whether the model contains any feasible solution.
  4. D. It constructs the model before any optimal solution has been computed.

Post-optimality analysis examines how the optimal solution and the objective value respond when inputs change after solving, rather than building the model or merely testing feasibility.

A bakery's solved model says to produce forty loaves and thirty cakes, giving a maximum profit of RM 260.00. Which part of this output is the optimal objective value?

  1. A. The flour limit that restricts how many loaves can be baked.
  2. B. The per-unit profit values used in the objective function.
  3. C. The quantities of forty loaves and thirty cakes chosen for production.
  4. D. The maximum profit of RM 260.00 earned at the chosen production quantities.

The optimal objective value is the value of the objective function at the optimum, here the maximum profit of RM 260.00; the loaves and cakes are the optimal solution itself.

40 flashcards and 20 quiz questions in this topic.

4. Transportation, Assignment and Integer Models

Transportation Model Structure and Balance · Initial Basic Feasible Solutions · Testing and Improving the Solution · Assignment Problems and the Hungarian Method · Integer and Binary Programming Models

What is a transportation model trying to achieve in a business decision problem?
It finds the lowest-cost way to ship goods from several sources with given supplies to several destinations with given demands.
In a transportation model, what does a source represent and what is meant by its supply?
A source is an origin such as a factory or warehouse, and its supply is the limited quantity of goods available to ship from that origin.
What is a destination in a transportation model and what does its demand mean?
A destination is a receiving point such as a customer or store, and its demand is the quantity of goods that must be delivered there.

In a transportation model, what condition defines a balanced problem?

  1. A. All unit shipping costs are equal
  2. B. Total supply equals total demand
  3. C. Each destination has exactly one source
  4. D. Total demand exceeds total supply

A problem is balanced when the total quantity available at all sources equals the total quantity required at all destinations. Equal costs, one-to-one links, or a demand excess do not define balance.

When total supply exceeds total demand in a transportation problem, what adjustment restores balance?

  1. A. Add a dummy source with supply equal to the excess demand and zero unit costs
  2. B. Add a dummy destination with demand equal to the excess supply and zero unit costs
  3. C. Reduce output at the largest source by the excess supply amount
  4. D. Increase demand at each real destination by the excess amount

When supply is greater than demand, the surplus units need a destination in the table, so a fictitious destination absorbing the excess is added at zero cost. A dummy source would address the opposite imbalance, and altering real supplies or demands would distort the original problem.

40 flashcards and 19 quiz questions in this topic.

5. Decision Analysis

Maximax and Maximin Decision Criteria · Minimax Regret and Equally Likely Criteria · Expected Monetary Value Under Risk · Expected Value of Perfect Information · Decision Trees and Rollback Analysis

When are the maximax and maximin criteria used to choose an alternative?
They are used for decisions under uncertainty, where the probabilities of the possible states of nature are unknown. Both rules work directly from the payoffs in the table without using probabilities.
What does a payoff table show in decision analysis?
It lists the alternatives as rows and the possible states of nature as columns, with each cell giving the payoff for that combination. It is the input to which maximax and maximin are applied.
What does the maximax (optimistic) criterion assume about the outcome?
It assumes the most favourable state of nature will occur for whichever alternative is chosen. The decision maker therefore concentrates on the best possible payoff of each alternative.

Which condition must hold for maximax and maximin to be the appropriate decision rules?

  1. A. The exact state of nature is already known
  2. B. The probabilities of the states of nature are unknown
  3. C. A decision tree has been drawn for the problem
  4. D. The probabilities of the states of nature are known

Maximax and maximin are rules for decision making under uncertainty, where no probabilities are assigned to states of nature; known probabilities call for expected-value methods instead.

A firm compares three plant sizes using payoffs in RM under high demand and low demand. A small plant pays 80,000 when demand is high and 10,000 when low; a large plant pays 120,000 when high and −30,000 when low; a medium plant pays 60,000 when high and 25,000 when low. Using maximax, which plant is chosen and what is its payoff?

  1. A. Medium plant, RM60,000.00
  2. B. Medium plant, RM25,000.00
  3. C. Small plant, RM80,000.00
  4. D. Large plant, RM120,000.00

For each plant the largest payoff is RM80,000.00 for the small plant, RM120,000.00 for the large plant and RM60,000.00 for the medium plant; maximax then takes the largest of these, RM120,000.00, so the large plant is chosen.

40 flashcards and 20 quiz questions in this topic.

6. Forecasting Models

Time Series Components and Forecasting Basics · Simple Moving Average Forecasting · Simple Exponential Smoothing · Trend Projection and Causal Forecasting · Measuring Forecast Accuracy

What is a time series in the context of forecasting?
A time series is a sequence of observations of a variable recorded in chronological order at successive, usually equally spaced, time periods. Forecasting uses its past pattern to estimate future values.
What does the trend component of a time series represent?
The trend is the long-term underlying direction of the series, rising or falling over an extended period. It reflects persistent structural growth or decline rather than short-term swings.
What characterises the seasonal component of a time series?
Seasonal variation is a regular, predictable fluctuation that repeats within a fixed period such as a year, quarter, month or day. It is tied to calendar or routine behaviour, for example higher retail sales in December.

A manufacturer observes that industry demand rises and falls over stretches of three to five years, with the length of each rise and fall varying and no fixed calendar pattern. Which time series component best describes this behaviour?

  1. A. Seasonal variation that repeats at the same calendar month
  2. B. Cyclical fluctuation driven by broader business conditions
  3. C. A steady long-term trend moving in one direction
  4. D. Random irregular movement with no discernible pattern

Cyclical fluctuation driven by broader business conditions consists of long-term rises and falls whose timing is irregular, unlike a fixed calendar seasonal pattern. The varying multi-year swings rule out a steady one-direction trend and pure random noise.

A firm is launching a completely new product and has no sales history for it. It asks experienced managers and industry analysts to estimate first-year demand. Which forecasting approach is being used?

  1. A. Qualitative forecasting based on expert judgement
  2. B. Moving average of recent actual demand
  3. C. Causal regression using historical data
  4. D. Quantitative time series analysis of past sales

Qualitative forecasting based on expert judgement is being used because there are no historical figures to model, so the estimate rests on opinions and experience. The other approaches all require past numerical data.

40 flashcards and 20 quiz questions in this topic.

7. Simulation and Queuing Models

Introduction to Simulation and Its Uses · Monte Carlo Simulation Procedure · Fundamentals of Queuing Systems · The M/M/1 Queuing Model · Little's Law and Performance Measures

What is simulation in the context of decision modelling?
Simulation is the process of building a model of a real system and experimenting with that model to study how the system behaves. It is used especially when the real system cannot be examined directly or solved with simple equations.
When is simulation the appropriate approach for a decision problem?
Simulation is appropriate when a problem is too complex to solve analytically. In that case, experimenting with a model gives useful insight even though an exact closed-form solution is unavailable.
How does simulation represent uncertainty in its inputs?
Instead of fixing uncertain inputs at one value, simulation samples them randomly from their probability distributions. Each run therefore reflects one possible combination of uncertain conditions.

Which description matches the output of a Monte Carlo simulation?

  1. A. A single exact value that is guaranteed to be the optimal decision
  2. B. A closed-form equation that solves the model analytically
  3. C. A fixed set of input values repeated unchanged in every trial
  4. D. A distribution of possible outcomes built from many random samples

Monte Carlo simulation repeatedly draws uncertain inputs at random and records each outcome, producing a distribution of possible results. It does not yield one certain value, an analytical formula, or unchanged inputs.

Why would a decision maker turn to simulation rather than an analytical model?

  1. A. Because the real system is too complex to be solved analytically
  2. B. Because simulation removes uncertainty by fixing each input value
  3. C. Because the simulation guarantees the mathematically optimal result
  4. D. Because analytical models cannot handle uncertainty of any kind

Simulation is chosen when the system is too complex for an analytical solution, even though its result is only an estimate. It does not guarantee optimality, and analytical methods can handle uncertainty, so those alternatives are incorrect.

40 flashcards and 20 quiz questions in this topic.

8. Investment Appraisal Models

Time Value of Money and Discounting · Net Present Value and Decision Rules · Calculating NPV: A Worked Example · Internal Rate of Return Fundamentals · Payback Period and Excel NPV

What is the time value of money?
It is the principle that money received today is worth more than the same amount received in the future, because money held now can be invested to earn a return. This is why future cash flows must be discounted before they can be compared with money invested today.
Give two reasons why a ringgit received today is worth more than a ringgit received one year from now.
Money in hand today can be invested to earn a return, so it grows over time. A future receipt also carries the risk of non-payment and loses purchasing power through inflation.
What is the required rate of return in investment appraisal?
It is the minimum return an investor is willing to accept for committing funds to a project, reflecting the project's risk and the return available elsewhere. It is used as the discount rate when converting future cash flows into present values.

In investment appraisal, what does the required rate of return represent?

  1. A. The minimum rate of return an investor requires, used as the discount rate
  2. B. The rate at which a project's accounting profit grows each year
  3. C. The total undiscounted cash inflows expected over the project's life
  4. D. The interest rate the firm pays on its existing bank loans

The required rate of return is the minimum acceptable return reflecting risk and opportunity cost, and it is used as the discount rate to convert future cash flows into present values. The other descriptions refer to borrowing cost, profit growth and raw cash inflows, none of which is the required return.

A project will pay RM4,000 at the end of year 2. If the required rate of return is 10%, what is the present value of this cash flow?

  1. A. RM3,005.26
  2. B. RM3,636.36
  3. C. RM4,000.00
  4. D. RM3,305.79

Using PV = FV/(1+r)^n with FV = RM4,000, r = 0.10 and n = 2: (1.10)^2 = 1.21, then RM4,000 / 1.21 = RM3,305.79. The other figures come from discounting for only one year, for three years, or from not discounting at all.

40 flashcards and 20 quiz questions in this topic.

Study every card

Every card and question in this course comes with the Lifetime package. Add it to GoodScores and practise with flashcards, quizzes and spaced review.

Get all 320 cards with Lifetime